Kyiv limits traffic on Pivdennyi Bridge after structural check
Public transport and light vehicles may cross one direction while engineers assess damage from the recent attack.
By Adrian Carter ·

Vehicles can now move across the Pivdennyi Bridge in Kyiv, but only in one direction and under strict weight limits. The city resumed limited traffic on the left-to-right bank carriageway on Monday after engineers cleared the section for temporary use.
Mayor Vitali Klitschko confirmed the decision following a review by experts from the National Infrastructure Development Institute. The inspection determined the structure is safe for controlled movement, aiming to restore connectivity without risking commuters.
Drivers must adhere to specific rules on the open lane. Public transport vehicles are allowed if they weigh up to 18 tonnes. Other cars must weigh 10 tonnes or less. Traffic does not flow freely; authorities manage the flow at set intervals to control the load on the bridge deck.
The opposite lane remains shut. The carriageway leading from the right bank to the left bank is still closed because it sustained damage during the overnight Russian attack. Officials will keep this section closed until further assessments are finished.
Specialists are currently analyzing the data from the recent inspection. They are calculating the load-bearing capacity of the damaged parts to determine the bridge's true technical condition. This step is required before any further sections can be reopened.
Teams from the municipal company Kyivavtoshliakhmist are working on the site. Their goal is to repair the structures damaged in the attack and return the bridge to its pre-incident state. Before the strike, both the Pivdennyi and Pivnichnyi bridges were closed, while two other bridges operated with restrictions and two stayed open.
The Ministry for Recovery, Infrastructure and Transport of Ukraine has also started preparations for a tunnel under the Dnipro River. The US firm Robbins has offered equipment and technical support for the project, which would provide an alternative route across the water.






